Ministerie van Openbare werken

                                                                                      PROJECTSTANDARD

 

PROJECT

  1. Renew the footbridge in Oude Charlesburg and the construction of footpaths and kiss and ride facilities at the school entrance.
  2. Building a multifunctional footbridge over Henck Arronstraat near the Orange School. The bridge over the road can also be used as signage.
  3. The construction of a footbridge over the Saramacca Canal in Good Expectation, near Staatsolie, as an extension of the Dr. ir. H.S. Adhin Street.
  4. Replacing a wooden footbridge at Taut Lui Faut, near Jai Krishnaweg, in Wanica district.
  5. The construction of a kiss and ride model at the school entrance for dropping off and collecting the pupils at the Anton Resida school on Commisaris Weythingweg, as well as setting up a parking space for the school.
  • Investing in entrepreneurs with great ideas but no capital.
  • Relocate money; new investment opportunities.

BACKGROUND

In addition to a safe learning climate, schools also want children to be taken to and from school safely. In the context of the safety of school children, it is an important aspect to develop the infrastructure in the vicinity of the schools. School children must be able to be dropped off safely at school and cross the road safely. The existing infrastructure must ensure that the walking distance for school children and residents is made shorter and safer. Many schools in the area have canals with broken bridges over which children can walk. We want to replace these with sustainable, safe bridges. We also want to improve the traffic situation for parking near schools and make it safer. This with the emphasis on the application of sustainable infrastructure and innovative models.